Infrastructure

Category
    • 2
    • 2
Category
    • 2
    • 2
Show more
-

Round Bollard 450D x 500H with Frame [HPFRC]

Providing, supplying & installing of Precast High Performance Alkali Resistant Fiber Reinforced, 9% by weight Iron oxide pigment of BIS approved Concrete Cylindrical Bollard Seat of ⌀ 450mm & Base Frame having Flexural Strength 8MPa Minimum and Compressive Strength 75MPa Minimum, with polished top surface with densification treatment (Acrylic Sealant + Lithium silicate densification- 3 coats), Cylindrical edges, Levelling adjustment provision.
₹15,000.00

Square Bollard 450L x 450B x 500H with Frame [HPFRC]

Providing,supplying & installing of Precast High Performance Alkali Resistant Fiber Reinforced, 9% by weight Iron oxide pigment of BIS approved Concrete Square Bollard Seat of size 450 mm x 450 mm x 450 mm & Base Frame having Flexural Strength 8MPa Minimum and Compressive Strength 75MPa Minimum, with polished top surface with densification treatment (Acrylic Sealant + Lithium silicate densification- 3 coats), Cylindricaled edges, Levelling adjustment provision
₹15,000.00

Cable Duct S&T 550

Excavation for foundation / pits / raft / trenches / mass areas, water tanks, septic tanks etc. in dense or hard soil for following depth, by mechanical or manual means including necessary dewatering, demucking, shoring/ strutting, segregation of reusable excavated earth from vegetation and debris, removing loose excavated matter from the excavated area,barricading as per Safety practices etc. complete as per drawing,specifications and as directed by EIC.Note: Measurement shall be made as per theoretical maximum plan dimensions of PCC details in the drawing. Separate / extra payment shallnot be made for working space.sorting out and stacking of useful materials, dressing of the sides, ramming of bottom, disposing of the excavated stuff up to 50 m. lead including lifts, for all kind of soil, all complete as per drawing, specifications, instruction & directions of the Engineer-in-charge. For all civil, plumbing, & infrastructure works. The excavation rates for Hard rock pit shall be 20% of total Excavation and remaining shall be for Normal hard soil.(Masonry Civil Trench with cover)
₹18,750.00
Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.